Monday, November 22, 2010

Looking out the Window

Windows delivered

The crew got started right away getting the windows in.

Mudroom, view out

Porch view

Bedroom
House from back

Bedroom from outside

Office, windows partially complete

Heating/Air ducts ready to be installed
Installation underway, and underground

 Another great week of weather, the addition is almost completely closed in. Rough in plumbing, heating and wiring scheduled for this week, along with the completion of the roof.  We are now into Thanksgiving week and work is scheduled right along. 

Sunday, November 14, 2010

Up on the Roof

View of trusses with the sun.

Consumer's Power working with the "Big" wires.

Truck that delivered trusses, sign says it all.

Trusses take up most of the yard.

Crew working on trusses
Placing the trusses one by one, a slow and particular process.

This day was out of the ordinary, keeping neighbors on the watch.


Another shot of wood in the air.




View of the action from the back yard.
Tuesday, Consumers Power arrived to run our electricity underground, the electrician chose that day to upgrade our power.  We were without power for part of the day, no biggy. Wednesday the trusses were delivered.  It is Mid November, yet the weather doesn't even require a jacket during the day.  This week the crew put up the trusses and roof.  Friday the felt went on the roof and the shingles will go on sometime next week.  Monday morning will be a vacation day as deer hunting season begins. The weather forecast is favorable for outside work this week and hopefully a bit into next.  The crew will be happy to get to inside work very soon.

Monday, November 8, 2010

There's a CCHHHIIILLLL out there.

Walls of the garage going up.
Framed in garage

Master Bath framed in

Laundry Room
Bedroom from the Porch

View of Hallway

Laundry Room from Outside
Welcome to the Fishbowl.
Pine Tree
Lots of action this week.  The Crew are trying to get the house all framed in and roofed while the weather is good.  Consumers should be here on Tuesday, trusses up on Wednesday and roof soon after.

Tuesday, November 2, 2010

Hello Walls

The crew wasted little time with the floor joists.

Their workroom (aka garage) offered shelter from the fierce winds.

Sub-floor allows all of us to walk the space.
The first walls go up, our project supervisor Del, is in green;-)
The crew put in Saturday work to guard against weather issues.


Another load delivered to Ottawa Drive.

The rooms are taking shape, Mike's Study on left, porch on right.

Visions of our main hallway.

Our Mud closet, hope it's big enough, haha.

The work continues in earnest this week. We have been blessed with fine weather.  It would be lovely to get the roof on within the next week and a half.  The crew is currently getting the walls framed in, and waiting on Consumers to run the power underground.  Then the rafters will be delivered and we will have a true visual of what this addition will look like.  We ordered the windows last week and finalized flooring decisions.  The Pups love the new space, we let them loose on the floor. Holly doesn't leave, but sniffs each and every crack and crevice.  Buddy sniffs a bit but not with the fever that a terrier does.  The weather forecast looks great for the rest of the week, hopefully the momentum continues. Hope everyone is enjoying this photo journal. On the home front, Mike is busy with boys basketball and I am busy making surprises for my dear ones for the holidays.

Tuesday, October 26, 2010

The Winds of November Come Early


Today the forcast is rain, high winds and storms through tomorrow.  This may impede the progress of our work.   At this point, I am anxious to get the addition framed in. The inside planning is going along.  The cushions for the porch furniture are complete, and the wall color has been chosen. 
 
The colors for the Master bedroom and bath have been chosen and the fabrics arrived over the weekend.  Soon, I will begin on the duvet cover and bed skirt.  
Bedroom, top 2 Duvet cover, stripe for bedskirt. the lightest paint chip will be the bedroom and the next darkest the masterbath.

Porch cushions are complete, the center green for the walls.

As of today there aren’t plans for window treatments on the porch.  The open wilderness  will be a nice view.  The Bedroom will have pleated shades.  A valance for the laundry room and  roman shade for the big closet.

Preparing to cut the expansion joints, check out the shopvac.

Delivery of the floor joists, they are engineered (stronger and more cost effective).

The joists in position, 1/2 complete.
The Mason's were here on Monday, finishing up on the first 1/2 of the driveway.  Cutting of expansion joints is an interesting operation.  Today the framers work on getting the floor joists set.  This addition will come to life this week, weather permitting.

OBTW, I know you are all looking and reading, so why don't you say something?

Thursday, October 21, 2010

A Week of Excitement

Pouring footings for garage
Garage footings awaiting the blocks.
Holly, inspecting the new garage.


Garage, awaiting cement.

Pouring of garage floor.
Garage foundation complete; pea-stone put into crawl

Floor is poured, now the fun begins.
The guys used this "buffing" machine several times.
Conduit where utilities will be run.

Sole plates and insulation on Thursday.


View of crawl space, they say it will be a clean crawl.

Another load of dirt.
Each time we returned home this week, there was visible progress.  A beautiful week all around.  Monday the footings were poured for the garage and the bricks were laid for its foundation. 

Tuesday the garage was readied for the floor, the foundations were backfilled and the garage floor was poured.  The team used a large machine (much like a buffer) and went over the cement floor several times, using different paddles at each step. The worry for that night was not the weather, but the deer that might run accross the cement.  All went well and there are no hoof prints in our floor.

While I was at work the pea stone was delivered; hearing later that it was quite loud and interesting watching a machine shoot small pebbles while being directed to the spot.  Just imagine not too many years ago when the guys would have had to shovel and haul all that pea stone. Wednesday evening saw a three foot deep trench which ran from the utility pole to the edge of our house.  Sometime next week, our utility cables will be rerouted underground.  Much to the neighbors' disappointment the crew left a bit early, to get a start on another job.

Today, the sole plates were put in and the insulation to the crawl space was installed.  See the vents for the crawl space.  The cool thing about them is they automatically open and close triggered by the outside temperature.  Whew, I thought we would have to crawl in there and do that.  The workers told me it was a very "clean" crawl.  No thanks.  The masons returned in the afternoon, filling the trench and getting the first section of the driveway ready for concrete. This evening, another load of fill was delivered for the driveway.

The mornings are downright cold now and days a bit chilly.  Might have to get out the "party" coffee pot out for the crew.

Stay Curious,

Cindy