 |
| Crew working in the laundry. |
 |
| Siding completed on front. |
 |
| Porch is taking shape. |
 |
| Quartz with the cabinet finishes. One on left is being changed to a calmer style. |
 |
| Office is taking shape. |
 |
| View of shower tile, accent stripe coming on Wed. |
|
|
|
|
Well it has been a couple of weeks since I have posted. Things are really beginning to roll. A couple times each week we need to get out, make a final decision and either order or go and pickup some items.
This past week there was a bit of stress, the initial kitchen wall measurement was incorrect, meaning that wall of the kitchen wouldn't hold the design. Yikes! Well after thinking about the alterations overnight, then sitting down with the designer for a couple hours on Saturday, we took the opportunity to tweak our design. It will be fabulous.
The floor in the laundry is down and I expect the grout to be done perhaps on Friday or Monday. The bathroom vanity is waiting in the garage. The painter is painting trim and getting ready for the final coat on the walls.
We ordered our "Easy Closets" (for the master closet) this week and expect them tomorrow.....all 19 boxes and 581 pounds of them. The UPS guy is either going to love us or.....
Tomorrow the crew comes through the kitchen wall to finish the hallway, and next week, probably the big wreck. I leave on Thursday for up north, and tomorrow may be the last meal I prepare in the old kitchen.
The kitchen is 2/3 packed up and I intend to finish next Tuesday.
No comments:
Post a Comment